National Battlefields Commission
2021-22 Departmental Sustainable Development Strategy
January 2021
1. Context for the Departmental Sustainable Development Strategy
Although the National Battlefields Commission is not bound by the Federal Sustainable Development Act and is not required to develop a full departmental sustainable development strategy, the National Battlefields Commission adheres to the principles of the Federal Sustainable Development Strategy (FSDS) by implementing the Policy on Green Procurement.
The Policy on Green Procurement supports the Government of Canada’s effort to promote environmental stewardship. In keeping with the objectives of the policy, the National Battlefields Commission supports sustainable development by integrating environmental performance considerations into the procurement decision-making process through the actions described in the “FSDS goal: low-carbon government” table in section 2.
2. Commitments for the National Battlefields Commission
FSDS goal: greening government
FSDS target | FSDS contributing action | Corresponding departmental action(s) | Contribution of each ministerial action to the objective and the FSDS target | Starting point(s), performance indicator(s) and target(s) | Link to the department’s Program Inventory |
---|---|---|---|---|---|
Actions in support of the greening government objective and the Policy on Green Procurement. | Reduce the use of vehicles. |
|
13. | Starting point: 97 hours of patrols by bike, by foot and with an electric golf kart were conducted in summer 2020. Target: For summer 2021, conduct at least 80 hours of patrol by bike, by foot or with an electric golf kart. Indicator: Number of hours of patrol by bike, by foot and with a golf kart. |
Maintenance of infrastructure and security. |
Improve the use of energy and the energetic efficiency of our buildings/ operations. Departments will use environmental criteria to reduce environmental impacts and ensure best value in government procurement decisions. |
|
13. | Starting point: The rainwater contained in a 10,000 L basin was reused by the Green Spaces Unit. Target: Continue to recover rainwater and use the recovered water to ensure a reduction in drinking water consumption of clean water to irrigate the plants and green spaces. Indicator: Number of litters of clean water saved. |
Maintenance of infrastructure and security. | |
|
13. | Starting point: The NBC had no low flow plumbing fixtures before 2018. Target: During new constructions replacements, install low flow plumbing fixtures to reduce the quantity of consumed water. Indicator: Quantity of low flow plumbing fixtures used. |
Maintenance of infrastructure and security. | ||
Improving the energy use and efficiency of our buildings/operations. Departments will use environmental criteria to reduce environmental impacts and ensure best value in government procurement decisions. |
|
13. | Starting point: The NBC carried out 246 LED replacements on the 349 street lamps. Target: As soon as the current bulbs cease to function, replace them with LED bulbs whenever possible. Performance measurement : Quantity of street lamps that have been converted to LED. |
Maintenance of infrastructure and security. | |
Departments will use environmental criteria to reduce environmental impacts and ensure best value in government procurement decisions. |
|
12.7 | Starting point: The NBC is aware of environmental considerations when purchasing goods; the NBC prioritizes regional purchases and prioritizes the purchase of used products for animation equipment and scenery. Target: When making new purchases, refer to the NBC's Sustainable Development Policy in effect since November 2010. Performance measurement : Continued implementation of the Policy on Green Procurement. |
Internal Services. |
3. Integrating sustainable development
The National Battlefields Commission will continue to ensure that its decision-making process includes consideration of FSDS goals and targets through its Strategic Environmental Assessment (SEA) process. A SEA for policy, plan or program proposals includes an analysis of the impacts of the given proposal on the environment, including on FSDS goals and targets.